- It is impossible to open an .fsp-project in ABBYY FlexiLayout Studio 10 or 11 once it was opened in ABBYY FlexiLayout Studio 12, so you should create a copy of the project before opening it in ABBYY FlexiLayout Studio 12 if you still need to open it in ABBYY FlexiLayout Studio 10 or 11.
- After opening a FlexiLayout Studio 10 or 11 project in ABBYY FlexiLayout Studio 12 you may need to delete all processing results and analyze all pages once again.
- Due to changes in FlexiLayout language some compilation errors may occur. In this case you will need to correct errors and re-compile FlexiLayouts.
Upgrading from ABBYY FlexiCapture 10 and 11
Updating ABBYY FlexiLayout Studio 10 or 11 projects (*.fsp)
Open ABBYY FlexiLayout Studio 10 or 11 .fsp projects in FlexiLayout Studio 12, with notes on backups, reanalyzing pages, and fixing compilation errors.
All FlexiLayout Studio 10 or 11 projects can be opened in FlexiLayout Studio 12. Please note the following:
Updating databases and projects created in ABBYY FlexiCapture Distributed
Previous
Using FlexiLayouts (*.afl) created in ABBYY FlexiLayout 10 or 11
Next
